Restaurant Client: Boynton Beach, FL

Location: Boynton Beach, FL

Length: 6 Days

Estimated Completion Date: 8/30/2019

Scope: The DWM Construction & Renovation team began bidding out this cafe refresh job in February. DWM was awarded the contract to complete this weeklong project for a national restaurant client. The full refresh scope includes 7 trades, including general interior, electrical, plumbing, cleaning, roofing, and equipment installation. The week refresh includes on-site project management by a DWM Construction & Renovation project manager.

Scope:

  • Half wall by BOH eliason doors is secured.

  • Front and back line cabinets isntalled

  • Counter tops placed, glued, seamed, sanded.

  • Pour new concrete and closed up the floor.

  • Install the new pastry/beverage cases.

  • Install tile floor

  • FRP applied to the wall.

  • Start building the back line of cabinets and counter tops.

  • Cut and install backsplash

  • Panel the half walls.

  • Wallpaper walls for die wall.

  • Ceiling tile instal

  • Install glass sneeze guard on the front line.