Grocery Client: Tampa, Florida
Project Location: Tampa, Florida
Project Duration: 6 days
Project Size: 147 sq. ft.
Trades: General Construction, Plumbing, Fire Suppression, Mechanical, Electrical and MMA Flooring Installers
Project Description: DWM Inc. was contracted to remove an existing kitchen at this location, which included; Removal of existing finishes to include all millwork, appliances, acoustic ceiling, drywall, framing, electrical, plumbing, commercial hood, duct work and fire suppression system. Once the Removal of all of the finishes was complete, DWM had to install new floor clean outs, place new reinforced concrete and refinish the flooring in the working area to match the existing MMA Resinous flooring throughout the store.