Retail Client: Midlothian, Virginia
Project Name: Coffee Shop Removal
Location: Midlothian, Virginia
Project Duration: 4 Weeks
Project Cost: $99,749.96
Trades: General Construction, Framing, Electrical, Plumbing, Sheetrock, Painting, Terrazzo and Millwork
Project Description: DWM Inc. was contracted to remove a Coffee shop in an existing Grocery Store. This project started with removal of all existing finishes including the existing tile flooring. After Demo was completed electrical and plumbing rough were completed and followed by Drywall installation. Once the Drywall installation was complete and FRP was installed, DWM moved forward with the installation of the Terrazzo flooring to match the adjacent finishes. To complete the project, DWM installed the customer supplied self serve coffee station.