Retail Client: Raynham, MA
Location: Raynham, MA
Length: 4 Weeks
Estimated Completion Date: 10/4/19
Scope: The DWM Construction & Renovation team began bidding out this white box job in May. DWM was awarded the contract to complete this 30 day project for a national retail real estate client. The full project scope has 7 different trades, including GC, plumbing, electrical, HVAC, flooring, painting, and roofing . This white box project will take a vacant 5,700 Sq. Ft of unfashionable retail space and turn it into a functional blank slate for future tenants use. This project includes on-site project management by a DWM Construction & Renovation project manager.
Scope of Work:
Removing 5,700 Sq. Ft of flooring (rolled carpet and VCT)
Demolition of framed wall impeding on visibility through window glazing
Demolition of existing ceiling suspended strip lighting Removal of all related demolition debris off site.
Construct two ADA compliant restrooms
Rough-in waste line and new 3" vent penetration through the roof
Bring water supply 180' from the main building supply to provide service for two new bathrooms
Frame, hand gypsum board, paint, and VCT floor
Accessory install (ADA compliant grab bars, beveled edge mirror, paper towel dispenser, waste paper cabinet, signage needed by building code)
Install motion sensor switch and lighting for both restrooms
Bathroom fan ventilation
Install 5,700 Sq. Ft of drop ceiling grid and tiles approximate 10' AFF
Insulate, hang gypsum board, tape, and prep for paint 120' demising wall.
Relocate approximately 55 fire sprinkler heads to be flex adjust into new drop ceiling
Install approximate 55 2x4 drop in lights in new drop ceiling Install duplex receptacles along demising wall per code
Test and update emergency lighting throughout the space to local code
Supply and install of 10 gal. water heater, bubbler, and utility sink
Removal and discard of two existing RTU's
Disconnect electrical and gas to existing 6 ton and 10 ton RTU's
Furnish and Install two Roof Top Air Handling Units
Rigging and dropping new 7 ton and 10 ton roof top units onto roof
Adjusting curb adapters
install two economizers
RGD's for new 10' drop ceiling and two bathrooms
Rework duct work as needed
Supply and insulate duct work per code
Run two thermostat wires for new RTU's
Test all equipment
Supply and install two 3'x7' wood doors with knock down metal frames with privacy locks.
Paint and install FRP in both bathrooms.